Oriental Rail Infrastructure Limited has secured orders worth Rs.6,57,30,720.00 (Rupees Six Crore Fifty‐Seven Lakh Thirty Thousand Seven Hundred Twenty only) from "Integral Coach Factory (ICF), Chennai, Indian Railways".
The order is for Supply and Installation of 88 set of coach set ofseats and berths for LSCN/BW2 coach.
Shares of Oriental Rail Infrastructure Ltd was last trading in BSE at Rs. 176.65 as compared to the previous close of Rs. 180.25. The total number of shares traded during the day was 15676 in over 268 trades.
The stock hit an intraday high of Rs. 176.65 and intraday low of 176.65. The net turnover during the day was Rs. 2769165.00.