H.G. Ateli Namaul Highway Private Limited, a wholly owned subsidiary of H.G. Infra Engineering Limited ('HGINFRA') has received the provisional completion certificate for the project mentioned below. The provisional completion certificate has been issued by the authority and the project has been provisionally declared fit for entry into commercial operation on March 11, 2022.
The project is for construction of proposed Namaul Bypass (Design Length 24.00 kin) & Ateli Mandi to Narnaul section of NH-11 from Km 43.445 to Km 56.900 (Design Length 14.00 Km) as an economic corridor-feeder route Pkg-II in the State of Haryana on Hybrid Annuity Mode.
The project was completed 255 days prior before the revised schedule completion date and is eligible for bonus.
Shares of H.G. Infra Engineering Limited was last trading in BSE at Rs. 575.45 as compared to the previous close of Rs. 556.60. The total number of shares traded during the day was 31882 in over 1705 trades.
The stock hit an intraday high of Rs. 582.00 and intraday low of 559.95. The net turnover during the day was Rs. 18379454.00.