TCM Ltd has received the following work order, DT. 27/02/2023 from Agency for New and Renewable Energy Research and Technology (ANERT), Department of Power, Government of Kerala as per Tender ID:2023_ANERT_548972_1 for the Design, Supply, Installation and Commissioning of Grid connected SPV Power Plants in Public Buildings at Thiruvananthapuram under Solar City Project (funded by Smart City Thiruvananthapuram Ltd).
Shares of TCM LTD. was last trading in BSE at Rs. 32.49 as compared to the previous close of Rs. 32.15. The total number of shares traded during the day was 6142 in over 29 trades.
The stock hit an intraday high of Rs. 33.89 and intraday low of 32.00. The net turnover during the day was Rs. 199775.00.