Brahmaputra Infrastructure Limited have received a LOA from the office of General Manager, NFR - CONST HQ - Engineering Maligaon, Guwahati, 781011 for the execution of the Contract for Protection of cutting and embankment by construction of RCC retaining wall, catch water drain, sub-surface drain, shot creting/providing concrete canvas, geo-jute textile turfing on slopes, finishing of blanketing materials etc. in between station Kawnpui & Sairang (30.00 km to 49.200 km) in connection with the construction of new BG Railway line from Bairabi to Sairang (Mizoram) Project for a total amount Rs. 101.51 Crores.
Shares of BRAHMAPUTRA INFRASTRUCTURE LTD. was last trading in BSE at Rs. 35.25 as compared to the previous close of Rs. 36.75. The total number of shares traded during the day was 52151 in over 322 trades.
The stock hit an intraday high of Rs. 37.50 and intraday low of 33.10. The net turnover during the day was Rs. 1826062.00.