Adani Renewable Energy Eight Limited ("ARE8L"), Wholly-owned stepdown subsidiary of Adani Green Energy Limited ("AGEL") has operationalized solar power project of 150 MW at Khavda, Gujarat.
With commissioning of this project, AGEL has achieved total operational renewable generation capacity of 19,985.8 MW and total operational BESS capacity of 3,366 MWh.
Based on the relevant clearances, it was decided at 10.42 p.m. on June 27, 2026 to operationalize the plant and commence power generation from June 28, 2026.
Shares of Adani Green Energy Limited was last trading in BSE at Rs. 1526.60 as compared to the previous close of Rs. 1525.45. The total number of shares traded during the day was 275043 in over 9691 trades.
The stock hit an intraday high of Rs. 1550.40 and intraday low of 1520.25. The net turnover during the day was Rs. 422489707.00.