NCC Ltd has received 2 (Two) Advance Work Orders dated 25th March 2025 from Bharat Sanchar Nigam Limited (BSNL) for Design, Supply, Construction, Installation, Upgradation, Operation and Maintenance of middle mile network of BharatNet, in Uttarakhand Telecom Circle (against Package No.- 05) and Madhya Pradesh, DNH & DD Telecom Circles (against Package No.- 01).
Package No. 5 includes Design, Supply, Construction, Installation, Upgradation, Operation and Maintenance of middle mile network of BharatNet, in Uttarakhand Telecom Circle. The order is valued at Rs. 2647.12 Crores (excl. GST) (Capex - Rs.1543.35 Crores, Opex - Rs. 1103.77 Crores).
Package No. 01 includes Design, Supply, Construction, Installation, Upgradation, Operation and Maintenance of middle mile network of BharatNet, in Madhya Pradesh, DNH & DD Telecom Circles. The order is valued at Rs. 8157.44 Crores (excl. GST) (Capex - Rs. 4189.05 Crores, Opex - Rs. 3968.39 Crores)
Shares of NCC Limited was last trading in BSE at Rs. 209.15 as compared to the previous close of Rs. 206.05. The total number of shares traded during the day was 781784 in over 8108 trades.
The stock hit an intraday high of Rs. 215.95 and intraday low of 207.95. The net turnover during the day was Rs. 164522340.00.