Dibang Power (Lot 4) Consortium (JV of M/s G R Infraprojects Limited and M/s Patel Engineering Limited) has executed the Contract Agreement with the NHPC Limited on 09th October 2023 for construction of Civil Works for LOT‐4: Head Race Tunnel including Intake, Pressure Shafts, Penstocks, Power House & Transformer Cavern, Tail Race Tunnel, Pothead Yard, Adits for Dibang Multipurpose Project, Arunachal Pradesh, India.
The bid project cost is Rs. 3637.12 crore.
Shares of G R Infraprojects Ltd was last trading in BSE at Rs. 1190.95 as compared to the previous close of Rs. 1209.85. The total number of shares traded during the day was 2005 in over 394 trades.
The stock hit an intraday high of Rs. 1205.00 and intraday low of 1184.10. The net turnover during the day was Rs. 2395449.00.