K&R Rail Engineering Limited, has signed an MOU with M/s. Muktinath Darshan Private Limited on 04/10/2023 for execution of Cable Car Project in Gandaki province of Nepal valued at 500 Million US Dollars. The total length of the Cable Car Project is about 84.32 Kilometers.
Shares of K&R Rail Engineering Ltd was last trading in BSE at Rs. 783.10 as compared to the previous close of Rs. 752.25. The total number of shares traded during the day was 18025 in over 409 trades.
The stock hit an intraday high of Rs. 789.85 and intraday low of 721.00. The net turnover during the day was Rs. 13812826.00.