Consequent upon successful commissioning, third part capacity of 21 MW out of 56 MW Kawas Solar PV Project at Kawas, Gujarat, is declared on Commercial Operation w.e.f. 15.08.2022. Now, full capacity of 56 MW has been commissioned.
With this, standalone installed and commercial capacity of NTPC has become 55089 MW, while group installed and commercial capacity of NTPC has become 69454 MW.
Shares of NTPC Limited was last trading in BSE at Rs. 158.55 as compared to the previous close of Rs. 153.55. The total number of shares traded during the day was 935141 in over 6661 trades.
The stock hit an intraday high of Rs. 158.90 and intraday low of 152.80. The net turnover during the day was Rs. 146888630.00.