Sewa-II Power Station (3 x 40 MW), Mashka (UT of J&K) which was under complete shutdown w.e.f. 25.09.2020 due to damage of Head Race Tunnel (HRT), has successfully restarted power generation from today i.e. 21.02.2022 with the synchronization of all three units with the grid.
Shares of NHPC Limited was last trading in BSE at Rs. 30.05 as compared to the previous close of Rs. 29.95. The total number of shares traded during the day was 525013 in over 2224 trades.
The stock hit an intraday high of Rs. 30.20 and intraday low of 29.75. The net turnover during the day was Rs. 15758790.00.