Greenpanel Industries Ltd had earlier announced the estimated time for installation of the new machinery (Mat Heating System) at Company's MDF plant situated at Chittoor, which has been extended by 3 (three) days due to technical reason. The normal operation of MDF Plant at Chittoor, Andhra Pradesh is expected to be resumed by January 28, 2022.
Shares of Greenpanel Industries Limited was last trading in BSE at Rs. 482.80 as compared to the previous close of Rs. 451.65. The total number of shares traded during the day was 55771 in over 4138 trades.
The stock hit an intraday high of Rs. 485.95 and intraday low of 434.60. The net turnover during the day was Rs. 26216862.00.