Dilip Buildcon Ltd has announced that the project "Four laning of Yavatmal to Wardha (Packege-III) section of NH-361 from Km 400.575 to Km 465.500 (design length 64.925 Km) under NHDP Phase-IV on Hybrid Annuity mode in the state of Maharashtra" has been completed. The Completion Certificate has been issued by the authority on January 17, 2022 and has declared the project fit for entry into commercial operation as on January 06, 2022.
Shares of Dilip Buildcon Limited was last trading in BSE at Rs. 376.85 as compared to the previous close of Rs. 389.75. The total number of shares traded during the day was 394740 in over 10916 trades.
The stock hit an intraday high of Rs. 400.00 and intraday low of 368.00. The net turnover during the day was Rs. 151166302.00.