DMR Engineering Limited (Formerly DMR Hydroengineering & Infrastructures Limited) has received a work order for Owner's Engineer Services (Short-term) for 1125MW Dorjilung Hydropower Project located in Bhutan.
The contract period of the work is 9 months for an aggregate amount of Rs. 2,58,91,500/- (Rupees Two Crore Fifty-Eight Lakh Ninety-One Thousand Five Hundred only), exclusive of any applicable taxes.
Shares of DMR Engineering Ltd was last trading in BSE at Rs. 34.30 as compared to the previous close of Rs. 31.50. The total number of shares traded during the day was 37050 in over 15 trades.
The stock hit an intraday high of Rs. 34.30 and intraday low of 32.00. The net turnover during the day was Rs. 1256463.00.