Stock Report

ACME Solar Commissions First Phase of 300 MW Rajasthan BESS Project



Posted On : 2026-03-07 10:36:11( TIMEZONE : IST )

ACME Solar Commissions First Phase of 300 MW Rajasthan BESS Project

ACME Solar Holdings Limited (formerly ACME Solar Holdings Private Limited, CIN: L40106HR2015PLC102129, BSE Scrip Code: 544283, NSE Symbol: ACMESOLAR) announced the commissioning of the first phase of its 300 MW/1400 MWh Battery Energy Storage System (BESS) project.

Through its wholly owned subsidiary ACME Sun Power Private Limited, the company has activated 33.335 MW/160.48 MWh capacity located at Village Badi Sid, Tehsil-Bap, Districts Phalodi and Jodhpur, Rajasthan. The commercial operation date (COD) for this phase-I is set for March 8, 2026.

This milestone advances ACME's energy storage initiatives, supporting grid stability and renewable integration in a key solar-rich region.

Shares of ACME Solar Holdings Limited was last trading in BSE at Rs. 228.20 as compared to the previous close of Rs. 231.25. The total number of shares traded during the day was 20637 in over 641 trades.

The stock hit an intraday high of Rs. 235.20 and intraday low of 227.70. The net turnover during the day was Rs. 4792390.00.

Source : Equity Bulls

Keywords

ACMESolarHoldings INE622W01025 300MW BESSProject