Adani Green Energy Twenty Four Limited, Wholly-owned stepdown subsidiary of the Company has operationalised incremental wind power project of 48 MW at Khavda, Gujarat.
With operationalisation of this plant, AGEL's total operational renewable generation capacity has increased to 14,290.9 MW.
Based on the relevant clearances, it was decided at 5.32 p.m. on April 17, 2025 to operationalize the plant from April 18, 2025.
Shares of Adani Green Energy Limited was last trading in BSE at Rs. 947.00 as compared to the previous close of Rs. 945.55. The total number of shares traded during the day was 239528 in over 6896 trades.
The stock hit an intraday high of Rs. 971.60 and intraday low of 940.25. The net turnover during the day was Rs. 228819479.00.