Consequent upon successful commissioning and due approvals, second & last part capacity of 80 MW out of 150 MW Chhattargarh Solar PV Project in Bikaner, Rajasthan of NTPC REL a stepdown subsidiary of NTPC Limited through its wholly owned subsidiary NTPC Green Energy Limited, is declared on Commercial Operation w.e.f. 29.03.2024.
The first part capacity of 70 MW has already been declared on commercial operation w.e.f. 21.02.2024.
With this, the total installed and commercial capacity of NTPC group has now become 75958 MW.
Shares of NTPC Limited was last trading in BSE at Rs. 335.95 as compared to the previous close of Rs. 330.65. The total number of shares traded during the day was 469325 in over 6294 trades.
The stock hit an intraday high of Rs. 340.00 and intraday low of 330.45. The net turnover during the day was Rs. 157805477.00.