Consequent upon successful commissioning, first part capacity of 10 MW out of 23 MW Solapur Solar PV Project at Maharashtra, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 30.12.2022.
With this, standalone installed and commercial capacity of NTPC has become 58269 MW, while group installed and commercial capacity of NTPC has become 70884 MW.
Shares of NTPC Limited was last trading in BSE at Rs. 166.35 as compared to the previous close of Rs. 166.65. The total number of shares traded during the day was 128115 in over 1598 trades.
The stock hit an intraday high of Rs. 167.85 and intraday low of 166.00. The net turnover during the day was Rs. 21341610.00.