Consequent upon successful commissioning, first part capacity of 100 MW out of 300 MW Nokhra Solar PV Project at Bikaner, Rajasthan, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 20.12.2022.
With this, standalone installed and commercial capacity of NTPC has become 58209 MW, while group installed and commercial capacity of NTPC will become 70824 MW.
Shares of NTPC Limited was last trading in BSE at Rs. 171.45 as compared to the previous close of Rs. 169.65. The total number of shares traded during the day was 516318 in over 5225 trades.
The stock hit an intraday high of Rs. 172.20 and intraday low of 169.40. The net turnover during the day was Rs. 88031227.00.