Dilip Buildcon Ltd has executed a contract agreement with the Gujarat Metro Rail Corporation (GMRC) Limited on December 02,2022 for construction of 8.702 kms elevated viaduct and 7 nos. stations (Excl. E&M, Architectural Finishing and Roofing) from Majura Gate (Ch.9090 m) to Saroli Dead End (Ch. 17791.851 m) under corridor-2 in connection with Surat Metro Rail Project Phase - 1 [Pkg-CS-6).
The project cost is Rs. 702.02 crore and completion period is 26 months.
Shares of Dilip Buildcon Limited was last trading in BSE at Rs. 238.05 as compared to the previous close of Rs. 232.35. The total number of shares traded during the day was 12315 in over 962 trades.
The stock hit an intraday high of Rs. 239.40 and intraday low of 232.40. The net turnover during the day was Rs. 2924390.00.