The upgradation of the Mini Blast Furnace II ('MBF-II') of Kirloskar Ferrous Industries Limited situated at Koppal plant, Karnataka has been completed and the operations of MBF-II have resumed from 4 July 2022.
After upgrade of MBF-II, the manufacturing capacity of pig iron in respect of MBF-II has increased from 1,80,000 Metric Tonne per annum to 2,17,600 Metric Tonne per annum and consequently, total manufacturing capacity of pig iron at company level has increased to 6,09,000 Metric Tonne per annum.
Shares of Kirloskar Ferrous Industries Ltd was last trading in BSE at Rs. 189.15 as compared to the previous close of Rs. 189.00. The total number of shares traded during the day was 17161 in over 1339 trades.
The stock hit an intraday high of Rs. 193.15 and intraday low of 185.60. The net turnover during the day was Rs. 3242310.00.