Consequent upon successful commissioning, last part capacity of 20 MW out of 100 MW Ramagundam Floating Solar PV Project at Ramagundam, Telangana is declared on Commercial Operation w.e.f. 00:00 Hrs. of 01.07.2022. With this, standalone installed and commercial capacity of NTPC has become 54769.20 MW, while group installed and commercial capacity of NTPC has become 69134.20 MW.
Shares of NTPC Limited was last trading in BSE at Rs. 140.55 as compared to the previous close of Rs. 143.15. The total number of shares traded during the day was 1475700 in over 11579 trades.
The stock hit an intraday high of Rs. 143.20 and intraday low of 139.80. The net turnover during the day was Rs. 208110596.00.