Consequent upon successful commissioning, first part capacity of 20 MW out of 56 MW Kawas Solar PV Project at Kawas, Gujarat, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 14.05.2022. With this, standalone installed and commercial capacity of NTPC has become 54616.68 MW. Further, group installed and commercial capacity of NTPC has become 68981.68 and 68321.68 MW respectively.
Shares of NTPC Limited was last trading in BSE at Rs. 144.05 as compared to the previous close of Rs. 148.60. The total number of shares traded during the day was 915340 in over 8780 trades.
The stock hit an intraday high of Rs. 149.95 and intraday low of 143.45. The net turnover during the day was Rs. 133701422.00.