Dilip Buildcon Ltd has announced that the project 'Four Laning of Sangli-Solapur (Package-IV: Mangalwedha to Solapur) section of NH-166 from existing Ch. Km 314.969 to Ch 370.452 (Design Ch km 321.600 to km 378.100) of length 56.500 km in the State of Maharashtra on Hybrid Annuity Mode' has been provisionally completed. The Provisional Completion Certificate has been issued by the authority and had declared the project fit for entry into commercial operation as on December 14, 2021.
The project cost was Rs. 1141.00 crore.
Shares of Dilip Buildcon Limited was last trading in BSE at Rs. 477.35 as compared to the previous close of Rs. 467.70. The total number of shares traded during the day was 18225 in over 1008 trades.
The stock hit an intraday high of Rs. 487.35 and intraday low of 471.65. The net turnover during the day was Rs. 8755004.00.