ATR Infrastructure Private Limited - Wholly Owned Subsidiary of IRB Infrastructure Developers Limited, has successfully completed concession period of Pune Nashik BOT Project on 8th October, 2021 and handed over the Project to the Ministry of Road Transport & Highways (MORTH). This Project SPV has contributed less than 1% of Consolidated total income of the Company as on September 30, 2021.
Shares of IRB Infrastructure Developers Limited was last trading in BSE at Rs. 209.85 as compared to the previous close of Rs. 207.35. The total number of shares traded during the day was 382908 in over 7665 trades.
The stock hit an intraday high of Rs. 214.30 and intraday low of 205.85. The net turnover during the day was Rs. 80296193.00.
Shares of IRB Infrastructure Developers Limited was last trading in NSE at Rs. 209.80 as compared to the previous close of Rs. 207.35. The total number of shares traded during the day was 4439178 in over 44789 trades.
The stock hit an intraday high of Rs. 214.40 and intraday low of 205.75. The total traded value during the day was Rs. 934155599.60.