Electrosteel Castings Limited has successfully completed the regular annual maintenance activities and resumed operations at the MBF Production Facility at the Khardah Works starting today i.e., 24 June, 2026. Furthermore, operations at the Main Plant are scheduled to resume on 25 June, 2026.
Shares of Electrosteel Castings Limited was last trading in BSE at Rs. 79.87 as compared to the previous close of Rs. 81.62. The total number of shares traded during the day was 107424 in over 856 trades.
The stock hit an intraday high of Rs. 81.60 and intraday low of 79.00. The net turnover during the day was Rs. 8578911.00.