The Board of Directors of National Aluminium Company Limited in their meeting held today i.e. 09.12.2025 approved the proposal for award of MDO Contract for Development and Operation of Pottangi Bauxite Mines along with Overland Conveyor Corridor (OLCC) and allied facilities in favour of M/s. Dilip Buildcon Limited (L-1 bidder) with Base Mining Charges @ Rs.423.00 per ton for a period of 25 years.
Shares of National Aluminium Company Limited was last trading in BSE at Rs. 265.50 as compared to the previous close of Rs. 268.45. The total number of shares traded during the day was 641166 in over 10636 trades.
The stock hit an intraday high of Rs. 267.95 and intraday low of 259.20. The net turnover during the day was Rs. 168618467.00.