Brahmaputra Infrastructure Limited have received a LOA from the office of Executive Director ( T.) - National Highway & Infrastructure Development Corporation of India for the execution of the Rehabilitation and Up-gradation of road from design Km 25.250 to Km 36.460 (Total Length: 11.210 Km) of Kailashahar - Kurti Bridge section of NH-208A to two lane with paved shoulder in the State of Tripura on EPC mode (Package III)-Balance work- Letter of Acceptance (LOA)- of an total amount Rs. 59.84 Crores.
Shares of BRAHMAPUTRA INFRASTRUCTURE LTD. was last trading in BSE at Rs. 71.38 as compared to the previous close of Rs. 69.99. The total number of shares traded during the day was 21196 in over 76 trades.
The stock hit an intraday high of Rs. 71.38 and intraday low of 68.65. The net turnover during the day was Rs. 1493139.00.