NTPC Limited's subsidiary NTPC Green Energy Limited (NGEL) regarding declaration of COD of first part capacity of 50.4 MW of Vanki Wind Energy Project located in Nakhatrana, Kutch, Gujarat of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited w.e.f. 00:00 hrs of 8th July 2026.
With this, the total installed capacity of NTPC group stands at 90,954 MW and commercial capacity at 89,874 MW.
Shares of NTPC Green Energy Limited was last trading in BSE at Rs. 94.09 as compared to the previous close of Rs. 92.97. The total number of shares traded during the day was 206601 in over 1954 trades.
The stock hit an intraday high of Rs. 95.18 and intraday low of 93.09. The net turnover during the day was Rs. 19463342.00.