NHPC Ltd has announced that 300 MW Bikaner Solar Power Project has been connected with ISTS and started injecting 31 MW power in the grid as on 31.03.2025. Commercial declaration of part capacity of 100 MW in phases shall be intimated in due course. The complete 300 MW Solar Project is likely to be commissioned by 31.08.2025.
Shares of NHPC Limited was last trading in BSE at Rs. 82.25 as compared to the previous close of Rs. 81.24. The total number of shares traded during the day was 4104790 in over 17076 trades.
The stock hit an intraday high of Rs. 86.91 and intraday low of 82.00. The net turnover during the day was Rs. 348225243.00.