NHPC Ltd has announced that the trial run of Unit#1 (200 MW) of ParbatiII HE Project (4x200 MW), Himachal Pradesh has been successfully completed on 28.03.2025. Hence, trial run of 3 units i.e. Unit#1, Unit#2 & Unit#3 of 200 MW each has been completed. The trial run of balance 1 Unit of Parbati-II HE Project is expected to be completed by 31.03.2025.
Shares of NHPC Limited was last trading in BSE at Rs. 82.25 as compared to the previous close of Rs. 81.24. The total number of shares traded during the day was 4104790 in over 17076 trades.
The stock hit an intraday high of Rs. 86.91 and intraday low of 82.00. The net turnover during the day was Rs. 348225243.00.