NHPC Ltd has announced that the trial run of Unit#2 (200 MW) of Parbati-II HE Project (4x200 MW), Himachal Pradesh has been successfully completed on 24.03.2025. The trial run of balance 3 Units of Parbati-II HE Project is expected to be completed by 31.03.2025.
Shares of NHPC Limited was last trading in BSE at Rs. 83.62 as compared to the previous close of Rs. 82.59. The total number of shares traded during the day was 1820325 in over 13292 trades.
The stock hit an intraday high of Rs. 85.00 and intraday low of 83.22. The net turnover during the day was Rs. 152835784.00.