G R Infraprojects Limited has received Letter of Acceptance dated 9th October 2024 from Maharashtra Metro Rail Corporation Limited (Nagpur Metro Rail Project).
The LoA is for Design and Construction of Elevated Metro Viaduct of length 17.624 km between Ch. 21256.814 to Ch. 38881.7 including Railway spans of length 79m & 100m and a 6-lane Double decker portion with Vehicular Underpass (VUP) from Ch. 25755.211 to Ch. 26895.211 for a total length of 1.14 km in Reach-1A of NMRP Phase-2.
Shares of G R Infraprojects Ltd was last trading in BSE at Rs. 1634.95 as compared to the previous close of Rs. 1600.75. The total number of shares traded during the day was 1055 in over 229 trades.
The stock hit an intraday high of Rs. 1648.90 and intraday low of 1611.25. The net turnover during the day was Rs. 1720876.00.