Stock Report

NAVA Ltd announces routine maintenance at 60 MW captive power plant



Posted On : 2024-06-17 20:34:50( TIMEZONE : IST )

NAVA Ltd announces routine maintenance at 60 MW captive power plant

NAVA Ltd has announced that the 60 MW Captive Power Plant (CPP-2) of the Company located at Kharagprasad in Odisha is scheduled for carrying out routine overhaul and maintenance from 17-06-2024 to 31-07-2024. The CPP-2 will resume operations with effect from August 1, 2024.

The Ferro Alloy Plant is, however, fully operational with power supply from the other Captive Power Plant (CPP-1) of 30 MW of the Company.

Shares of Nava Bharat Ventures Limited was last trading in BSE at Rs. 643.10 as compared to the previous close of Rs. 635.95. The total number of shares traded during the day was 19803 in over 1247 trades.

The stock hit an intraday high of Rs. 648.45 and intraday low of 630.00. The net turnover during the day was Rs. 12655639.00.

Source : Equity Bulls

Keywords

NAVA INE725A01022 RoutineMaintenance 60MW CaptivePowerPlant