Unit#2 (800 MW) of Telangana STPP, Stage-I (2x800 MW) is declared on Commercial Operation w.e.f. 00:00 Hrs. of 01.03.2024.
With this, standalone and group installed and commercial capacity of NTPC will become 58638 MW and 74758 MW respectively.
Shares of NTPC Limited was last trading in BSE at Rs. 335.45 as compared to the previous close of Rs. 333.00. The total number of shares traded during the day was 254656 in over 5347 trades.
The stock hit an intraday high of Rs. 336.95 and intraday low of 330.75. The net turnover during the day was Rs. 85008858.00.