The Unit#1 (800 MW) of Telangana STPP, Stage-I (2x800 MW) is declared on Commercial Operation w.e.f. 00:00 Hrs. of 28.09.2023.
With this, standalone and group commercial capacity of NTPC will become 57838 MW and 73824 MW respectively.
Shares of NTPC Limited was last trading in BSE at Rs. 240.20 as compared to the previous close of Rs. 239.60. The total number of shares traded during the day was 287273 in over 4125 trades.
The stock hit an intraday high of Rs. 243.20 and intraday low of 239.20. The net turnover during the day was Rs. 69428402.00.