RVNL emerges as the Lowest Bidder (L1) for "Construction of 4 Nos. Tunnels (total Length 1.6km) with ballast less track, Earthwork in formation, Construction of Important Bridges (2nos), Major Bridges (1no), Minor Bridges (25nos), Supply of Stone ballast, Track linking, side drain retaining wall etc. from Km 831.8 to Km 841.9 in Dharakoh Maramjhiri section in connection with third line."
The project cost is Rs. 311.17 crores.
Shares of Rail Vikas Nigam Limited was last trading in BSE at Rs. 169.80 as compared to the previous close of Rs. 166.85. The total number of shares traded during the day was 3392976 in over 25877 trades.
The stock hit an intraday high of Rs. 171.70 and intraday low of 164.80. The net turnover during the day was Rs. 574540545.00.