The Government of Arunachal Pradesh has conveyed its approval on 21.07.2023 for allotment of Subansiri Upper HE Project (2000 MW) and Kamala HE Project (1800 MW) to NHPC Limited.
Shares of NHPC Limited was last trading in BSE at Rs. 47.02 as compared to the previous close of Rs. 48.24. The total number of shares traded during the day was 1201881 in over 3177 trades.
The stock hit an intraday high of Rs. 48.53 and intraday low of 46.84. The net turnover during the day was Rs. 57037686.00.