Stock Report

NTPC completes trial operation by 660 MW capacity unit of Barh Super Thermal Power Project



Posted On : 2023-07-06 18:41:31( TIMEZONE : IST )

NTPC completes trial operation by 660 MW capacity unit of Barh Super Thermal Power Project

Based on achievement of approved norms and due approvals, Unit-2 of 660 MW capacity of Stage-I (3 x 660 MW) of Barh Super Thermal Power Project in the State of Bihar, has successfully completed trial operation and consequently included in the installed capacity of NTPC Limited.

With this, installed capacity of NTPC Limited and NTPC group has become 57038 MW and 73024 MW respectively.

Shares of NTPC Limited was last trading in BSE at Rs. 196.55 as compared to the previous close of Rs. 193.45. The total number of shares traded during the day was 480772 in over 6566 trades.

The stock hit an intraday high of Rs. 197.15 and intraday low of 192.70. The net turnover during the day was Rs. 94118787.00.

Source : Equity Bulls

Keywords

NTPC INE733E01010 BarhSuperThermalPowerProject Unit2 660MW