Waaree Renewable Technologies Limited (Formerly known as Sangam Renewables Limited) have received a work order of Turnkey EPC job work for Engineering, Procurement and Construction (EPC) services in respect of setting up of a solar power project of 36 MWp DC capacity.
The project is expected to be completed in the F.Y.2023-24, as per the terms of order.
Shares of Waaree Renewable Technologies Limited (Formerly known as Sangam Renewables Limited) was last trading in BSE at Rs. 1002.20 as compared to the previous close of Rs. 1006.35. The total number of shares traded during the day was 18888 in over 1156 trades.
The stock hit an intraday high of Rs. 1022.00 and intraday low of 999.00. The net turnover during the day was Rs. 19009266.00.