Steelcast Ltd has commissioned its 5 (Five) MW Solar Power Plant located at Village: Ratanpar, Taluka: Umrala, District: Bhavnagar (Gujarat) for captive use effective from 30th March, 2023.
The commissioning of this 5 (Five) MW Solar Power Plant will lead the Company in the direction of being self-reliant in power and reducing the carbon footprint, apart from saving in Electricity/Power cost.
Shares of STEELCAST LTD. was last trading in BSE at Rs. 470.00 as compared to the previous close of Rs. 448.15. The total number of shares traded during the day was 193 in over 64 trades.
The stock hit an intraday high of Rs. 474.60 and intraday low of 452.55. The net turnover during the day was Rs. 89718.00.