Ahluwalia Contracts (India) Limited has secured the below orders:
MMRDA work for Design, Fabrication, Supply and Erection of Pre-engineering Building Structural Steel Works at Mandale Depot cum workshop at Mumbai Metro Rail project of MMRDA - Rs. 68.05 crores
Light House Major Upgradation for Chandigarh Railway Station on Modular Concept on Engineering Procurement and Construction EPC Mode at Chandigarh - Rail Land Development Authority, New Delhi - Rs. 462.00 crores
The order inflow during the FY 2022-23 stands at Rs.3644.77 Crores, till date.
Shares of Ahluwalia Contracts (India) Limited was last trading in BSE at Rs. 420.50 as compared to the previous close of Rs. 404.50. The total number of shares traded during the day was 3414 in over 267 trades.
The stock hit an intraday high of Rs. 430.00 and intraday low of 414.25. The net turnover during the day was Rs. 1450770.00.