Consequent upon successful commissioning, first part capacity of 10 MW out of 20 MW Gandhar Solar PV Project at Gandhar, Gujarat, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 23.08.2022.
With this, standalone installed and commercial capacity of NTPC will become 55099 MW, while group installed and commercial capacity of NTPC will become 69464 MW.
Shares of NTPC Limited was last trading in BSE at Rs. 156.55 as compared to the previous close of Rs. 157.70. The total number of shares traded during the day was 747417 in over 3329 trades.
The stock hit an intraday high of Rs. 158.85 and intraday low of 156.10. The net turnover during the day was Rs. 117359024.00.