Cconsequent upon successful commissioning, third part capacity of 42.5 MW of 100 MW Ramagundam Floating Solar PV Project at Ramagundam, Telangana, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 24.03.2022.
With this, standalone installed and commercial capacity of NTPC has become 54494.68 MW. Further, group installed and commercial capacity of NTPC has become 68609.68 and 67949.68 MW respectively.
Shares of NTPC Limited was last trading in BSE at Rs. 135.40 as compared to the previous close of Rs. 133.45. The total number of shares traded during the day was 443606 in over 4897 trades.
The stock hit an intraday high of Rs. 135.65 and intraday low of 133.00. The net turnover during the day was Rs. 59845862.00.