Gujarat Sidhee Cement Limited has announced that the cement plant of the Company at Sidheegram is planned to take annual maintenance shutdown of the Clinker Unit for annual maintenance routine jobs for a period of 17 to 20 days.
The Company has started the kiln from 22/09/2021 at its factory at Sidheegram, Gujarat. The production is expected to start from 23/09/2021. The Company's plant shall be fully operational by 25/09/2021.
Shares of Gujarat Sidhee Cement Limited., was last trading in BSE at Rs. 49.25 as compared to the previous close of Rs. 49.05. The total number of shares traded during the day was 10845 in over 211 trades.
The stock hit an intraday high of Rs. 50.05 and intraday low of 49. The net turnover during the day was Rs. 536311.