NHPC Ltd has announced that Unit #3 (60 MW) of Bairasiul Power Station (3 X 60 MW) in Himachal Pradesh has been tested and commissioned after completion of Renovation and Modernization works. The commercial operation of Unit#3 of Bairasiul Power Station shall start from 00.00 Hrs of 31.08.2021.
Shares of NHPC Limited was last trading in BSE at Rs. 26.65 as compared to the previous close of Rs. 26.5. The total number of shares traded during the day was 450431 in over 1496 trades.
The stock hit an intraday high of Rs. 26.75 and intraday low of 26.5. The net turnover during the day was Rs. 11999528.