The unit No. two of 56.5 MW of 113 MW Rongnichu Hydro Electric Plant installed by Madhya Bharat Power Corporation Limited, a subsidiary of Sarda Energy & Minerals Ltd., has also been granted clearance under Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2016 for supply of power post successful completion of trial run operation after demonstrating continuous operation at full load for 12 hours and testing for 10% overload (62.15 MW) on 30th June 2021.
Shares of SARDA ENERGY & MINERALS LTD. was last trading in BSE at Rs.623 as compared to the previous close of Rs. 645.25. The total number of shares traded during the day was 6396 in over 157 trades.
The stock hit an intraday high of Rs. 668.95 and intraday low of 615. The net turnover during the day was Rs. 4071628.