The construction arm of L&T has secured a significant order in the Nuclear sector from Nuclear Power Corporation of India Limited (NPCIL) for its Heavy Civil Infrastructure business in India to construct the Main Plant Civil Works of the Kudankulam 5&6 units (KKNPP 5&6 - 2X1000 MWe)
The Kudankulam Nuclear Power Plant is India's first Light Water Reactor (LWR) of 6 units with a generation capacity of 1000 MWe each. The scope of work includes construction of the Reactor Building, Reactor Auxiliary Building, Turbine Building, Diesel Generator Building and other Safety Related Structures in a duration of 64 Months.
L&T is currently executing similar works of Kudankulam 3&4 units (KKNPP 3&4) in the same premises.
Shares of LARSEN & TOUBRO LTD. was last trading in BSE at Rs.1548.3 as compared to the previous close of Rs. 1548.75. The total number of shares traded during the day was 92366 in over 4060 trades.
The stock hit an intraday high of Rs. 1567.3 and intraday low of 1533.75. The net turnover during the day was Rs. 143478346.