Stock Report

MEP Infrastructure Developers Limited commences tolling operations at Badarpur Elevated Fee Plaza



Posted On : 2021-02-16 11:05:00( TIMEZONE : IST )

MEP Infrastructure Developers Limited commences tolling operations at Badarpur Elevated Fee Plaza

MEP Infrastructure Developers Limited ('MEP') has received the Work Order dated February 15, 2021 from the National Highways Authority of India ('NHAI') and have commenced the tolling operations from 16.02.2021 (8.00 Hrs) for the Project of collection of user fee for Badarpur Elevated Fee Plaza at Km. 18.700 and Km. 20.200 on Section from Km. 16.100 to Km. 20.500 of NH-2 in the State of Delhi and Haryana. The period of the said Contract is 3 (Three) Months (from 16.02.2021 (8.00 Hrs) to 16.05.2021 (8.00 Hrs).

Shares of MEP Infrastructure Developers Ltd was last trading in BSE at Rs.17.45 as compared to the previous close of Rs. 16.9. The total number of shares traded during the day was 82084 in over 344 trades.

The stock hit an intraday high of Rs. 18.4 and intraday low of 17.25. The net turnover during the day was Rs. 1468484.

Source : Equity Bulls

Keywords