Gayatri Projects Ltd has been declared as L-1 bidder for the project "Development of six lane access controlled Highway in Uttar Pradesh portion of Delhi Saharanpur Highway from Delhi/UP Border to EPE Junction (Ch. 14.750 to Ch. 31.200) in Uttar Pradesh on EPC mode under Economic Corridor in phase1 of Bharatmala Pariyojana (P2)".
The value of the work is INR 1323.52 Crores (Rupees One Thousand Three Hundred and Twenty Three Crores and Fifty Two lakhs Only).
Shares of GAYATRI PROJECTS LTD. was last trading in BSE at Rs.39.25 as compared to the previous close of Rs. 37.4. The total number of shares traded during the day was 850907 in over 1384 trades.
The stock hit an intraday high of Rs. 39.25 and intraday low of 37.3. The net turnover during the day was Rs. 33176339.