Consequent upon successful commissioning, 8 MW part capacity of 20 MW Auraiya Solar PV Project at Auraiya, UP, has been declared on Commercial Operation w.e.f. 00:00 Hrs. of 10.11.2020.
With this, the commissioned as well as commercial capacity of NTPC and NTPC group has become 51163 MW and 62918 MW respectively.
Shares of NTPC LTD. was last trading in BSE at Rs.89.5 as compared to the previous close of Rs. 87.35. The total number of shares traded during the day was 2230372 in over 7751 trades.
The stock hit an intraday high of Rs. 89.8 and intraday low of 87.7. The net turnover during the day was Rs. 197821487.